facilities
At this unit we have:
Main Offices and Main Wharehose;
GPL Requalification Department, capable of requalify up to 6000 G26 and 800 G110 LPG bottles per day;
The Central Anticorrosive protection Department installed on a 2000 m2 industrial hall containing 2 gritblasting tunnels, 1 zink spray metalization tunnel and the painting area;
Metalomechanical Central Department installed in 4 industrial halls, spreading across circa 5.000 m2, where the metallic structures are fabricated, as well as the piping and the storage tanks. These halls are equipped with modern machines from which we emphasize an automatic saw capable of cutting beams up to 1000 mm wide and 700 mm high, CNC benders, CNC cutters, Welding robots, etc.
The mini photovoltaic production unit capable of producing 250 KVA, which allows to cover for 20% of our electric power needs.
At Santiago do Cacém and to serve the Sines Petrochemical Industry we have an industrial hall with 2.120 m2 implanted in a lot of 7.500 m2.
At this hall we have the second anticorrosive protection unit including a gritblast tunnel and a zink spray metallization tunnel and painting area.
We also have metalomechanical unit capable of fabricating metallic structure as well as pipping. This unit has several equipments among which a CNC bender and a CNC cutter.
Our Siege and Head Office are located at Maputo Downtown.
At The CFM facilities also at Maputo, we build an industrial hall of 1.800 m2 located in a lot of 5.500 m2, where we perform metalomechanical and anticorrosive protection works similar to the ones we do in Portugal.